the news now

The world's news, cross-checked among reputable sources.

This is a new development in a story we have covered before · earlier coverage

Building Collapse in East São Paulo Leaves Five Dead

4 sources across 2 countries · Brazil · Chile

Who reported this

  • G1 Brazil · Centre-left · Grupo Globo (Marinho family)
  • CNN Brasil Brazil · Centre · Rubens Menin (MRV)
  • Folha de S.Paulo Brazil · Centre · Grupo Folha (Frias family)
  • La Tercera Chile · Centre-right · Copesa (Saieh family)

What the colours mean

  • Left
  • Centre-left
  • Centre
  • Centre-right
  • Right
  • A hatched block means the outlet is affiliated with, or controlled by, a state.

Political lean describes where an outlet sits within the politics of its own country. It is never a position on a single global scale.

Political lean is comparable inside one country and not across them, which is why the bar groups by country first. Publicly funded broadcasters are not marked as state-linked.

The owner of each outlet is listed as a matter of record, not as a judgement about the outlet.

A building under construction collapsed onto a neighboring residence in the Penha neighborhood of east São Paulo on Saturday, leaving five people dead. The victims include two women, one of whom was pregnant, and three others whose bodies were located later during the rescue operation. A man and a seven year old girl were rescued alive. The collapse occurred around 2 a.m. and affected a home where several members of a Bolivian family lived and worked in a sewing workshop. One person remains missing as firefighters and civil defense agents continue their search.

São Paulo Mayor Ricardo Nunes stated that the 11 story construction was irregular and had been the target of a 2021 judicial action for demolition due to structural problems. According to city officials, a new permit was issued in 2023 on the condition that the previous structure be demolished. Although a city employee signed a report in February 2024 claiming the demolition had occurred, the mayor said satellite images and neighbor testimony prove the structure remained. That employee has been suspended for 30 days pending a criminal investigation by the Civil Police.

The construction company, New Home, released a statement saying it is conducting an internal investigation and that there is no evidence the incident resulted exclusively from its conduct. A lawyer for the company claimed the project was in a regular situation and that a previous embargo had been lifted. Meanwhile, the Civil Defense is evaluating whether heavy rains that hit the city may have contributed to the collapse.

Reporting on the event varied by political lean. Center outlets focused heavily on the legal irregularities of the construction and the subsequent administrative investigation. Center left coverage emphasized the human toll on the Bolivian families and the potential criminal liability of the city official. Center right coverage framed the event primarily as a consequence of severe weather and regional instability caused by heavy rains.

How each side framed it

Centre-left
Highlighted the vulnerability of the immigrant victims and the potential for criminal charges against officials.
Centre
Focused on the timeline of judicial actions and the administrative failure of the city inspection.
Centre-right
Emphasized the role of heavy rains and broader weather alerts as the primary context for the disaster.

Sources

91% of the statements in this article were traced back to the source articles listed above.